Atal Bhujal Yojana (ATAL JAL): States, Districts, Budget, What Farmers Get and Status After 2025

Atal Bhujal Yojana (ATAL JAL): States, Districts, Budget, What Farmers Get and Status After 202515 min read

Atal Bhujal Yojana (ATAL JAL) was a Rs 6,000 crore central sector scheme for community-led groundwater management, with half the money from a World Bank loan. It covered 8,203 water-stressed gram panchayats in 229 blocks of 80 districts in seven states: Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Uttar Pradesh. Villages built water budgets and Water Security Plans, and states earned incentive money for results. Farmers did not get cash directly; they got training, data and support for drip, sprinkler and crop change. Per the Ministry of Jal Shakti, the scheme ran from 1 April 2020 to 15 October 2025 as a pilot and is now closed.

What is Atal Bhujal Yojana (ATAL JAL)?

Atal Bhujal Yojana, also called ATAL JAL, is a Ministry of Jal Shakti central sector scheme to improve groundwater management with the active participation of village communities. It was launched on 25 December 2019, the birth anniversary of Atal Bihari Vajpayee, and focused on water-stressed areas of seven states.

The PIB backgrounder calls it a scheme to "improve ground water management through community participation" with a primary focus on demand-side management. In simple words: instead of only digging more recharge structures, the scheme asked villages to measure their water, count how much they use, and cut use to what the aquifer can refill.

The 2022 backgrounder also lists who it was meant to help: women, small and marginal farmers, agricultural labourers, and rural families hit by floods and droughts. It tied the scheme to source sustainability for Jal Jeevan Mission drinking water, since most rural taps in India depend on groundwater.

Why did India need a groundwater scheme like this?

Groundwater is India's main irrigation and drinking water source, and it is being pumped faster than it refills in many places. The PIB backgrounder says groundwater supports nearly 65 percent of the irrigated area and about 85 percent of rural drinking water supply. Unregulated pumping has pulled water levels down fast.

The World Bank gave its own numbers when it signed the loan in 2020. It said the number of drilled tube wells rose from 1 million in 1950 to nearly 30 million in 2010, and that groundwater-irrigated area went from about 3 million hectares to more than 35 million hectares. It warned that, if trends continued, 60 percent of districts could reach a critical level within two decades, putting at least 25 percent of farm output at risk.

The latest national assessment shows why the problem has not gone away. The PIB release on the 2025 assessment puts national groundwater extraction at 60.63 percent of the extractable resource. Of 6,762 assessment units (blocks, taluks or mandals), 730 (10.80 percent) are over-exploited, 201 critical and 758 semi-critical. Most of the country is still classed safe, but the over-exploited blocks are concentrated in exactly the states where farmers depend on borewells.

Which states and districts did Atal Bhujal Yojana cover?

It covered seven states: Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Uttar Pradesh. The final footprint was 8,203 gram panchayats in 229 blocks across 80 districts. The scheme was not implemented in Chhattisgarh, and not every district of a covered state was included.

StateDistrictsBlocksGram panchayats
Gujarat6361,873
Haryana14361,647
Karnataka14411,199
Madhya Pradesh69670
Maharashtra13431,133
Rajasthan17381,132
Uttar Pradesh1026549
Total802298,203

The table is the annexure to the Ministry of Jal Shakti reply of 11 December 2025. The ministry also clarified that in Rajasthan only Chittorgarh was included from the Pratapgarh, Udaipur and Chittorgarh group, and the 30 July 2026 reply states that Akola district in Maharashtra was not covered.

The same 8,203 / 229 / 80 figures appear in the Ministry's December 2025 reply and in the 30 July 2026 reply to Parliament, and they are the final reported footprint of the scheme.

The World Bank notes the states were chosen on the degree of groundwater exploitation and degradation, existing legal and regulatory instruments, institutional readiness and past experience, and that they span both the hard rock aquifers of peninsular India and the alluvial aquifers of the Indo-Gangetic plains. Tamil Nadu, Punjab and Bihar were not in the list.

How much money did the scheme have, and how much came from the World Bank?

The outlay was Rs 6,000 crore over five years (2020-21 to 2024-25). Half, Rs 3,000 crore, was a World Bank loan that the Central Government repays; the other half was central budget support. The entire amount was passed to states as grants. The World Bank loan agreement signed in February 2020 was for US$450 million.

This is the structure from the PIB backgrounder and the World Bank release. The loan sits with the Centre, so states did not take on debt.

ItemFigureSource
Total outlayRs 6,000 crore over 5 years (2020-21 to 2024-25)PIB backgrounder, 2022
World Bank share50 percent, loan repaid by the CentrePIB backgrounder, 2022
World Bank loan agreementUS$450 million, signed 17 February 2020World Bank, 2020
Funds disbursed or assigned, to 30 November 2025Rs 3,602.68 crorePIB, 4 December 2025
Funds utilised, to 30 November 2025Rs 3,593.41 crorePIB, 4 December 2025

Note that the Rs 3,602 crore actually sent to states by November 2025 is lower than the Rs 6,000 crore headline. The scheme paid for results, not for sanction, so money moved only when states proved progress. The next section explains how.

How did the money flow? What are Disbursement Linked Indicators?

ATAL JAL ran on a Program for Results model. States received incentive money only after showing measured results against pre-set targets called Disbursement Linked Indicators (DLIs). Funds went to state governments, not to gram panchayats or individual farmers. Preparing water budgets and Water Security Plans was one of the DLIs.

The 4 December 2025 Lok Sabha reply says plainly: state governments become eligible for incentive amounts based on their overall achievements under the DLIs, and funds are not released to GPs individually. It adds that district-wise fund release was not made.

The scheme had two components, as laid out in the backgrounder:

  • Institutional strengthening and capacity building. Better groundwater monitoring networks, training, and stronger Water User Associations in the states.
  • Incentive component. Rewards to states for results such as data dissemination, preparing Water Security Plans, implementing interventions through convergence with other schemes, and adopting demand-side practices.

For a farmer, the practical meaning is this: the scheme did not hand out a subsidy cheque. It paid the state for building the systems and doing the work, and the village plan then drew on other schemes to fund works.

What were the objectives of Atal Bhujal Yojana?

The main objective was to improve groundwater management in selected water-stressed areas through community participation, with a focus on demand-side measures. The ministry's December 2025 reply says it aimed to do this by strengthening institutions and governance and by rewarding states for groundwater conservation at the grassroots.

The backgrounder lists four expected outcomes:

  1. Stronger monitoring networks and capacity building, so groundwater data is collected, stored, analysed and shared.
  2. More realistic water budgets and community-led Water Security Plans at panchayat level.
  3. Implementation of those plans by converging with ongoing central and state schemes.
  4. Efficient use of available groundwater, with stress on demand-side measures such as micro irrigation, crop diversification and electricity feeder separation.

Its listed benefits include source sustainability for Jal Jeevan Mission, better water use efficiency and cropping patterns, and a contribution to the goal of doubling farmers' income. Treat the last one as a stated aim, not a measured result.

What is a Water Security Plan and what does a gram panchayat do under it?

A Water Security Plan is a village-level plan, built from a local water budget, listing what each gram panchayat will do to balance water supply and use. It includes demand-side steps like micro irrigation and crop change, and supply-side steps like check dams and recharge structures. Villages updated the plan every year.

The World Bank describes the water budget as an assessment of surface and groundwater conditions, both quantity and quality, that identifies current and future needs. The plan then focuses on improving groundwater quantity. According to the July 2026 PIB reply, all 8,203 gram panchayats prepared and annually updated participatory water budgets and plans, supported by more than 1.28 lakh GP-level trainings. NGOs worked as District Implementation Partners.

A typical sequence in a village, based on the backgrounder and the PIB replies, looks like this:

  1. Measure: groundwater levels are recorded from wells, with piezometers, digital water level recorders and rain gauges installed in almost all participating GPs.
  2. Share: the data is displayed publicly, through physical boards as well as electronic means.
  3. Budget: the village compares recharge with use for drinking, farming and other needs.
  4. Plan: the Water Security Plan lists demand-side and supply-side measures.
  5. Deliver: works are taken up by convergence with ongoing schemes, because the scheme itself did not give the village a project grant.
  6. Review: assessments track whether groundwater levels improved.

Convergence is a key term. In Uttar Pradesh, the state project unit reported that Rs 275.35 crore had been converged from other schemes towards activities in the 549 participating GPs, according to the December 2025 reply.

What did farmers actually get from Atal Bhujal Yojana?

Farmers got training, groundwater data, a say in the village plan, and access to water-saving measures arranged through other schemes. They did not get a direct cash benefit from ATAL JAL. The visible gains were drip and sprinkler irrigation, mulching, crop diversification, and more recharge structures near their land.

The ministry's figures for the seven states are large. About 9.7 lakh hectares were brought under efficient water-use practices such as drip and sprinkler irrigation, mulching and crop diversification. More than 99,000 existing water conservation and recharge structures were mapped, and around 70,000 wells at GP level were monitored with the data shared publicly.

A district example from the December 2025 reply: in Chittorgarh, Rajasthan, about 3,700 hectares came under efficient water use including drip, sprinklers, pipelines, crop shifting (cotton and paddy to pulses and millets) and polyhouse or mulching. The district also reported over 700 wells identified for monitoring, 31 piezometers built, 40 rain gauge stations installed, 354 supply-side structures built or renovated (30 July 2026 reply), and 480 GP-level trainings.

What farmers gotHow it reached them
Training on water use and crop choiceGP-level trainings run with NGO District Implementation Partners
Public groundwater data for their villageWells monitored and data displayed publicly
Drip, sprinkler, pipelines, mulching, crop changeDemand-side steps in the Water Security Plan, funded by convergence
Check dams, ponds, recharge shafts nearbySupply-side steps in the plan, built through convergence
A voice in the village planCommunity-led planning, with a women's participation requirement

Which demand-side measures did farmers adopt under the scheme?

Demand-side measures cut the amount of groundwater a farm uses. Under ATAL JAL these were mainly drip and sprinkler irrigation, underground pipelines, mulching, crop diversification and, in the scheme design, electricity feeder separation. The state-wise area figures show Maharashtra, Haryana and Karnataka led in hectares.

StateArea under efficient water use (ha)Supply-side structures built or renovated
Gujarat86,4305,782
Haryana233,98511,664
Karnataka213,61626,200
Madhya Pradesh21,2059,876
Maharashtra274,94911,662
Rajasthan89,97019,126
Uttar Pradesh51,5696,184
Total971,72490,494

Area figures are from the annexure to the 4 December 2025 reply. Structure counts are the state totals of the district-wise annexure to the 30 July 2026 reply. The "efficient water use" column is a combined count of drip, sprinkler, crop diversification and similar practices, so do not read it as drip area alone.

Two points from the field. First, mulching is the cheapest demand-side step and works for small farms; our post on mulching types, depth and benefits covers materials and how much to lay. Second, crop change is the biggest lever: moving a plot from paddy or cotton to pulses or millets cuts irrigation need sharply, and our post on crop rotation plans shows how to fit a low-water crop into your cycle without losing the field's productivity. The Punjab DSR incentive in direct seeding of rice is another example of a state paying for a demand-side change.

What supply-side structures were built?

Supply-side structures add water to the aquifer or store it: check dams, ponds, recharge shafts and pits. The Ministry of Jal Shakti's 30 July 2026 reply to Parliament gives a district-wise count and a grand total of 90,494 structures built or renovated across the seven states.

The largest district counts in that reply were Jaipur (6,179), Chhatarpur (4,153), Chikkaballapur (3,961), Tumakuru (3,695) and Ramanagara (3,360). Karnataka had the highest state total, at 26,200.

In addition, more than 99,000 existing conservation and artificial recharge structures were mapped, which gives each village a record of what it already has. For farmers, a farm pond is the supply-side structure most within reach. Karnataka's scheme is covered in Krishi Bhagya and farm pond subsidy.

Did groundwater levels actually improve?

In part. According to assessments from 2023 to 2025, 180 of the 229 blocks covered (about 79 percent) showed improvement in groundwater levels. Results differed widely by state. Madhya Pradesh improved in all 9 blocks, while Uttar Pradesh improved in 16 of 26 and Haryana in 19 of 36.

StateBlocks coveredBlocks with improved groundwater level
Gujarat3631
Haryana3619
Karnataka4137
Madhya Pradesh99
Maharashtra4339
Rajasthan3829
Uttar Pradesh2616
Total229180

Source: Annexure II of the 30 July 2026 PIB reply. At GP level in Uttar Pradesh, 344 of 549 GPs improved in 2023 to 2025 assessments, and the remaining 205 had not yet shown enough improvement to meet the scheme benchmark (4 December 2025 reply).

Be careful with the claim. These are groundwater level assessments in covered blocks, not a controlled study that isolates the scheme's effect from rainfall. Rainfall in the assessment years matters a lot to water table readings. The Quality Council of India also carried out an overall impact assessment, which the ministry says recorded better community awareness, women's participation in leadership and decision making, social inclusivity and willingness to conserve water.

Is Atal Bhujal Yojana still running in 2026? What is its status after 2025?

No. The Ministry of Jal Shakti told Parliament on 30 July 2026 that the scheme was implemented from 1 April 2020 to 15 October 2025 as a pilot with a fixed duration and outlay. It describes the scheme in the past tense and calls it a replicable model other states can take up.

The July 2026 reply says ATAL JAL "successfully demonstrated the efficacy of community centred ground water management and provided a replicable model". The approved outlay period was 2020-21 to 2024-25, and implementation ran to 15 October 2025.

The July 2026 reply describes a closed pilot that gave a replicable model for other states to take up. Farmers in states that were not covered cannot enrol in it.

What continues: the groundwater data and the village plans stay on record. The ministry says Atal Bhujal data feeds the Jal Dharohar portal, which collates geo-tagged water body data. Other programmes, including Jal Shakti Abhiyan: Catch the Rain and Jal Sanchay Jan Bhagidari, continue the work of building recharge and rainwater structures through convergence with schemes such as MGNREGS.

How could a farmer take part in Atal Bhujal Yojana? Was there an application form?

There was no individual application. Participation was at village level: the gram panchayat, water user groups and NGO partners ran the process, and farmers joined through gram sabha meetings, trainings and the village plan. Farmers in non-covered villages could not enrol on their own, and the scheme is now closed.

For a farmer in a covered village, taking part meant:

  • Attending the gram sabha and trainings where the water budget and plan were discussed.
  • Sharing well and cropping details so the village could count real water use.
  • Choosing demand-side options such as drip, sprinkler, mulching or a less water-hungry crop, which were then funded through other schemes.
  • Watching the public data on groundwater levels displayed for the village.

The mandatory share of women also mattered. The scheme mandated a minimum of 33 percent women's participation in active decision-making (30 July 2026 reply to Parliament).

What can a farmer use now to save groundwater and get support?

Use schemes that are open. For drip and sprinkler, the PMKSY Per Drop More Crop component and your state's horticulture or agriculture department are the route. For pumping cost, PM-KUSUM solar pumps help. For farm ponds, check state schemes. Subsidy rates differ by state and crop, so confirm locally.

NeedWhere to lookOur guide
Drip and sprinkler irrigationPMKSY Per Drop More Crop (micro irrigation) via your state agriculture or horticulture department; see the PMKSY micro irrigation portalAgriculture subsidy schemes in India
Solar pump to cut diesel and power costPM-KUSUM through the state nodal agencyPM-KUSUM solar pump subsidy
Farm pond for storage and rechargeState schemes such as Krishi Bhagya in KarnatakaKrishi Bhagya farm pond subsidy
Lower water use in paddyState incentive schemes such as Punjab's DSR incentivePunjab DSR incentive scheme
Deadlines for all of theseState portals, kharif and rabi windowsAgri schemes calendar

The PMKSY micro irrigation portal describes its centrally sponsored scheme as aimed at enhancing water use efficiency by promoting drip and sprinkler technologies and encouraging farmers to adopt water-saving technologies. It lists the Per Drop More Crop guidelines and state-wise MIS. The subsidy rate varies by farmer category and state, so check your state department for the current rate.

Two further steps cost little. Fix leaking pipes and channels, since conveyance loss is water you pumped for nothing. And read your soil health card before choosing a fertiliser plan, so you do not over-irrigate to wash out salts or push water through a crop that does not need it; see how to read your soil health card. If you irrigate with drip, our guide to water-soluble fertiliser for drip users explains fertigation basics.

How does Atal Bhujal Yojana compare with other water schemes?

ATAL JAL is a groundwater governance scheme working through villages and rewarding states for results. PMKSY Per Drop More Crop subsidises on-farm micro irrigation for individual farmers. Jal Shakti Abhiyan pushes rainwater harvesting through campaigns and convergence. PM-KUSUM supports solar pumps. They serve different needs and often overlap in one village.

SchemeWho gets supportMain focusStatus per sources opened
Atal Bhujal YojanaState governments (for results); villages benefitGroundwater management and demand-side measures in 8,203 GPsClosed 15 October 2025 (PIB, July 2026)
PMKSY Per Drop More CropIndividual farmers via state departmentsDrip and sprinkler micro irrigationActive scheme portal; check state rates
Jal Shakti Abhiyan: Catch the RainDistricts, communities, local bodiesRainwater harvesting and water body mappingContinuing per December 2025 reply
PM-KUSUMIndividual farmers via state agenciesSolar pumps and feeder solarisationSee our KUSUM guide for the latest

Deeper guides on PMKSY watershed work for rainfed farmers and on Tamil Nadu micro-irrigation subsidy are planned. Until those are live, our agriculture subsidy schemes overview is the best starting point.

What did the scheme teach? Lessons for villages and farmers

The main lesson is that groundwater can be managed when villagers see their own data. Measure first, plan second, then fix the biggest use. The results also show that improvement is uneven: where rainfall, soil and cropping pattern differ, the same plan gives different outcomes. Water budgeting works best when farmers help build it.

  • Data builds trust. Public display of well levels gave villages a shared fact base instead of arguments.
  • Crop choice beats gadgets. Efficient use covered drip and mulching, but the district example in Chittorgarh also shows crop shifting to pulses and millets.
  • Convergence is the weak point. Because the scheme did not fund works itself, results depended on how well states joined it with other schemes. Uttar Pradesh's lower block-improvement rate (16 of 26) suggests this varied.
  • Small farmers need low-cost options. Mulching, scheduling and leak repair cost far less than a drip system and still lower use.

Treat these as our reading of the data, not the ministry's conclusions. The ministry's own summary is that the pilot proved the community-centred model is replicable.

Atal Bhujal Yojana FAQs on eligibility, benefits and payments

Short answers: a farmer could not apply individually, no direct payment was made to farmers or gram panchayats, and the scheme ended in October 2025. For the seven covered states, benefits were village plans, data, training and works funded by convergence. See the FAQ block below for the questions most often searched.

If you were told that a payment is due to you under Atal Bhujal Yojana, be careful. The Lok Sabha reply states that funds are not released to GPs individually, and the scheme paid states against results. Any message asking for a fee to "register" for the scheme should be treated as a scam; check with your block agriculture office.

Conclusion

Atal Bhujal Yojana was India's largest community-led groundwater pilot: Rs 6,000 crore, half from the World Bank, 8,203 gram panchayats in seven states, and village water budgets and Water Security Plans in every one. Reported results are real but uneven, with 180 of 229 blocks improving. It paid states for results, never farmers directly, and the Ministry of Jal Shakti says it ran from 1 April 2020 to 15 October 2025. If you farm in a covered village, ask your panchayat for the Water Security Plan. If you do not, use PMKSY micro irrigation, KUSUM and state schemes now.

Atal Bhujal YojanaATAL JALgroundwaterwater security plangram panchayatmicro irrigationcrop diversificationMinistry of Jal ShaktiWorld Bankwater budgetgovernment schemesProgram for Results

Questions Farmers Ask

What is Atal Bhujal Yojana?
Atal Bhujal Yojana (ATAL JAL) was a Ministry of Jal Shakti central sector scheme for community-led groundwater management. It worked through gram panchayats, which prepared water budgets and Water Security Plans, with a focus on demand-side steps like micro irrigation and crop diversification. It was launched on 25 December 2019.
Which states are covered under Atal Bhujal Yojana?
Seven states: Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Uttar Pradesh. The Ministry of Jal Shakti reports 8,203 gram panchayats in 229 blocks across 80 districts. Chhattisgarh was not implemented, and Bihar, Punjab and Tamil Nadu were not part of it.
What is the budget of Atal Bhujal Yojana?
The outlay was Rs 6,000 crore over five years (2020-21 to 2024-25). Half was a World Bank loan, repaid by the Centre, and half was central budget support. All of it was passed to states as grants. By 30 November 2025, Rs 3,602.68 crore had been disbursed or assigned.
How much did the World Bank give for Atal Bhujal Yojana?
The World Bank loan agreement signed on 17 February 2020 was for US$450 million. The PIB backgrounder says 50 percent of the Rs 6,000 crore outlay was the World Bank loan, which the Central Government repays. Funds were released against results, called Disbursement Linked Indicators.
What are the objectives of Atal Bhujal Yojana?
To improve groundwater management in water-stressed areas through community participation. Specific aims were better monitoring and data, realistic water budgets, community-led Water Security Plans carried out by convergence with other schemes, and efficient use of water through micro irrigation, crop diversification and electricity feeder separation.
What is a Water Security Plan under Atal Bhujal Yojana?
It is a gram panchayat plan built on a local water budget. It lists demand-side measures (micro irrigation, crop diversification, underground pipelines) and supply-side measures (check dams, recharge structures). All 8,203 participating gram panchayats prepared one and updated it each year, per the Ministry of Jal Shakti.
Do farmers get money directly under Atal Bhujal Yojana?
No. The scheme paid state governments for results, and funds were not released to gram panchayats or individual farmers. Farmers benefited through trainings, public groundwater data and water-saving works arranged by convergence with other schemes. Anyone asking a fee for registration should be treated with caution.
Is Atal Bhujal Yojana still active in 2026?
No. A 30 July 2026 PIB reply says the scheme was implemented from 1 April 2020 to 15 October 2025 as a pilot with a fixed duration and outlay. It calls it a replicable model for other states.
How can a farmer apply for Atal Bhujal Yojana?
There was no individual application. Participation was through the gram panchayat, gram sabha meetings and trainings in covered villages. With the scheme closed, farmers should look at PMKSY Per Drop More Crop for drip and sprinkler, PM-KUSUM for solar pumps, and their state agriculture department.
Did Atal Bhujal Yojana improve groundwater levels?
Partly. In assessments from 2023 to 2025, 180 of the 229 covered blocks showed improved groundwater levels, per a July 2026 PIB reply. Madhya Pradesh improved in all 9 blocks, Uttar Pradesh in 16 of 26. Rainfall also affects water tables, so the scheme is not the only cause.
How many gram panchayats were covered under Atal Bhujal Yojana?
The final count is 8,203 gram panchayats in 229 blocks of 80 districts.
What demand-side measures were promoted under ATAL JAL?
Drip and sprinkler irrigation, underground pipelines, mulching, crop diversification and electricity feeder separation. About 9.7 lakh hectares across the seven states were brought under efficient water-use practices, according to the Ministry of Jal Shakti. In Chittorgarh, crops shifted from cotton and paddy to pulses and millets.
Akshat Dadhich

Senior Microbiologist and Production Executive

Senior Microbiologist and Production Executive at Katyayani Organics. BSc in Biotechnology, MSc in Microbiology, 2.5 years of experience.

View all authors

Read Next in Government Schemes

Leave a Comment