14 min readUnder the Magel Tyala Saur Krushi Pump Yojana, MSEDCL gives you a solar pump set, panels included, and you pay only a small share of the price. MSEDCL says general category farmers pay 10% and SC/ST farmers pay 5%; the Central and State governments pay the rest. Pump size follows your land: 3 HP up to 2.5 acres, 5 HP for 2.51 to 5 acres and 7.5 HP above 5 acres. You apply online on the MSEDCL portal with the A-1 form, a 7/12 extract showing the water source and Aadhaar, get a beneficiary number by SMS, pay the firm quotation, pick an empanelled vendor and wait for installation. The scheme carries a five-year repair period and insurance.
What is the Magel Tyala Saur Krushi Pump Yojana?
Magel Tyala Saur Krushi Pump Yojana means "solar farm pump for whoever asks". MSEDCL, the Maharashtra power distribution company, runs it for the state. A farmer who qualifies gets solar panels and a complete farm pump set and pays only a small share of the price. The rest is paid by the Central and State governments, according to the MSEDCL scheme page.
The scheme is not the same as the older ones. The MSEDCL page says farmers who already got a pump under Atal Saur Krushi Pump Yojana 1, Atal Saur Krushi Pump Yojana 2 or Mukhyamantri Saur Krushi Pump Yojana cannot apply again. So if your neighbour got a pump under one of those, the new scheme is meant for farmers who did not.
The Government of Maharashtra decided the policy in its Government Resolution of 25 July 2024 (No. Sankirna-2024/Pra.Kra.97/Urja-5), which MSEDCL hosts on the scheme page. The resolution says the government has decided a policy of giving solar agricultural pumps to those who ask for them. On 13 September 2024, All India Radio News reported that Deputy Chief Minister Devendra Fadnavis opened the web portal for registering farmers, and that about two lakh farmers had been selected in the previous six months, with about 45,000 pumps installed. The MSEDCL FAQ adds that 2,63,156 solar agricultural pumps had been installed in the state under all schemes as on 6 September 2024.
The scheme page also lists the benefits MSEDCL promises: a five-year repair guarantee including insurance, no electricity bill for the pump, no worry about load-shedding, and daytime water for irrigation.
What is the subsidy for solar pumps in Maharashtra, and how much does the farmer pay?
The farmer pays 10% of the pump cost if he is in the general category and 5% if he is SC or ST. The MSEDCL scheme page says the Central and State governments subsidise the remaining part. The MSEDCL FAQ repeats the same two figures and calls them 10% and 5% of the pump price.
| Category | Farmer pays | Rest of the cost | Source |
|---|---|---|---|
| General category | 10% of the pump price | Paid by Central and State governments | MSEDCL scheme page and FAQ |
| SC / ST | 5% of the pump price | Paid by Central and State governments | MSEDCL scheme page and FAQ |
Think of it per Rs 100 of pump price. A general category farmer pays Rs 10 and an SC/ST farmer pays Rs 5. The pump price itself is the one on your quotation. Do not take a number from a video or a vendor; the quotation issued to you through the portal is the only figure that counts.
You may also see "95% subsidy" on websites. That is the same thing seen from the other side: a 5% farmer share leaves 95% paid by the governments. For a general category farmer the match is 90%.
What is the Maharashtra solar subsidy amount in 2026 in rupees?
The Maharashtra solar pump subsidy works as a share of the pump price. The farmer pays 10% (general category) or 5% (SC/ST) and the Central and State governments pay the rest, which is 90% or 95%. The rupee amount you pay appears as the firm quotation on the MSEDCL portal after you apply.
The price depends on the pump size. For PM-KUSUM, the national scheme, the PIB booklet of May 2023 says central support is worked out on a benchmark cost that MNRE fixes every year for a standalone solar pump.
| If the pump price is | General category pays | SC / ST pays |
|---|---|---|
| Rs 100 (example number only, not a real price) | Rs 10 | Rs 5 |
| Rs 1,000 (example number only) | Rs 100 | Rs 50 |
The method is simple. A 10% share is Rs 10 for every Rs 100 of pump price, and a 5% share is Rs 5. The firm quotation on the portal is the amount you pay.
Which solar pump size (HP) will I get for my land?
The pump size follows your landholding. MSEDCL gives a 3 HP pump up to 2.5 acres, a 5 HP pump for 2.51 to 5 acres and a 7.5 HP pump above 5 acres. You are allowed to ask for a smaller pump than your eligibility.
| Your agricultural land | Solar pump capacity | Can you ask for less? |
|---|---|---|
| Up to 2.5 acres | 3 HP | Yes, a smaller pump than eligible is allowed |
| 2.51 to 5 acres | 5 HP | Yes |
| Above 5 acres | 7.5 HP | Yes |
The figures come from the MSEDCL scheme page and the FAQ page, and both agree. The 7.5 HP solar water pump is the largest size on offer under this scheme. Farmers searching "7.5 HP solar water pump subsidy" are asking for the top slab: it is for holdings above 5 acres, and the farmer share is the same 10% or 5% of that pump's price.
A bigger pump is not always better. A borewell that gives less water than the pump can lift will make the pump run dry. Match the pump to your water source, not only to your acres. MSEDCL checks the water source during the survey.
Who is eligible for the Maharashtra solar pump scheme?
You are eligible if you hold agricultural land, have a sustainable water source, and have not already taken a pump under the earlier solar schemes. The water source can be your own well or borewell, an individual or community farm pond, or land next to a river or stream that flows all year. MSEDCL checks the source.
- Land: agricultural land as per the slabs in the HP table above.
- Water source: an individual or community farm pond, a well, a borewell, or land adjacent to a perennial river or stream. The page says an assured source is verified by MSEDCL.
- No earlier benefit: farmers who benefited from Atal Saur Krushi Pump Yojana 1 or 2 or Mukhyamantri Saur Krushi Pump Yojana are not eligible.
- Grid supply: the FAQ says the scheme is for farmers who have a sustainable water source and where electricity supply for a conventional farm pump has not been provided before.
- Preference: the FAQ says preference goes to farmers who have a pending payment with MSEDCL but are not yet connected.
One restriction is easy to miss. The scheme page says the solar pumps cannot be used to draw water from reservoirs of water conservation works. If your only water is such a reservoir, the pump is not allowed on it.
What documents are needed for the Magel Tyala solar pump application?
The MSEDCL FAQ asks for a 7/12 extract that shows the water source, an Aadhaar card, and a caste certificate if you are SC/ST. If you are not the only owner, you need a no-objection certificate from the other owners. If your water source is in a dark zone, you need one from the Ground Water Survey Department. You also give a mobile number and water-source details.
| Document or detail | When it is needed | Source |
|---|---|---|
| 7/12 land record showing the water source | Always | MSEDCL FAQ |
| Aadhaar card | Always | MSEDCL FAQ |
| Caste certificate | SC/ST applicants (for the 5% share) | MSEDCL FAQ |
| No-objection certificate from other owners | If you are not the sole owner of the land | MSEDCL FAQ |
| No-objection certificate from the Ground Water Survey Department | If the water source is in a dark zone | MSEDCL FAQ |
| Mobile number, e-mail (if any), water source and location details | Always | MSEDCL FAQ |
The off-grid page asks for your bank account number and IFSC code if your application is rejected after the joint survey, so that the quotation amount can be refunded.
A tip that saves a rejection: make sure the water source is written on the 7/12 extract. The FAQ asks for the extract "showing the water source". If your well or borewell is not entered, get the entry made before you apply.
How to apply for the Maharashtra solar pump subsidy step by step?
You apply online on the MSEDCL portal by filling the A-1 form and uploading the documents. Open the Apply link on the scheme page, pick your pump category, fill in your personal, land and water-source details, upload the papers and submit. You then get a beneficiary number and status updates by SMS.
- Open the MSEDCL scheme page and use the Apply link to reach the application portal. The portal home page, mahadiscom.in/solar_MTSKPY/index.php, lists "New Applications (Land Owner)" and "New Applications (Forest Rights Land)" under Apply.
- Fill in the A-1 form online for your pump category: 3 HP, 5 HP or 7.5 HP, or the paid-pending category.
- Enter your land details, water source and location, and your mobile number.
- Upload the 7/12 extract, Aadhaar, and the caste certificate and no-objection certificates if they apply to you.
- Submit. The system sends a beneficiary number to your registered mobile by SMS. Save the SMS.
- Track the application on the portal with that beneficiary number. If online filing fails, the FAQ says to contact the taluka sub-divisional MSEDCL office or the toll-free helpline.
The farmer share is paid later, after the firm quotation is issued. Money is paid only through the portal steps shown by MSEDCL. The live guide on PM-KUSUM solar pump subsidy gives the same warning about agents for all states.
How do you pay the farmer share and what is a firm quotation?
A firm quotation is the payment amount MSEDCL issues to you on the portal. The MSEDCL off-grid page says that when the status reads "FIRM QUOTATION ISSUED SUCCESS" you can pay online (internet banking, cards, UPI, wallets) or offline.
The scheme page tells you to use the Make Payment link on the portal. After the money is received, the status changes to "PAYMENT RECEIVED". Only then can you choose the vendor. So the order is: apply, get quotation, pay, pick vendor.
Pay only on the portal or by the offline method MSEDCL shows on its page. Keep the payment receipt with your beneficiary number. If your application is rejected after the joint survey, the page says to submit your bank account number and IFSC code so that the quotation amount is refunded.
How to check Magel Tyala solar pump status online?
Use the beneficiary ID that MSEDCL sent you by SMS. The MSEDCL off-grid page says you can enter it on the portal under "Track application status / payment", or look in the MAHAVITARAN app under "off-grid Solar Agri Pump Appl Status". The scheme page also has an "Application Current Status" link.
| Status you see | What it means for you |
|---|---|
| A1 Form Submitted | Your form is in. If an "Upload Documents" tab appears, upload again the documents named in your SMS. |
| A1 Form Rejected | The portal shows the reason. Fix the point and file again as the page directs. |
| FIRM QUOTATION ISSUED SUCCESS | Pay the quotation amount online or offline. |
| PAYMENT RECEIVED | Use "Search Vendor" to choose an empanelled vendor through an OTP-based process. |
| REJECTED after JOINT SURVEY | Send your bank account number and IFSC code to get the quotation refund. |
These status names are from MSEDCL's own off-grid page, which lists the same 3 HP, 5 HP and 7.5 HP pump categories and the same helplines. The Magel Tyala scheme page has its own "Application Current Status" link, so use that first and the off-grid steps as the second route. If your mobile number has changed, the off-grid page says to contact the SE (O&M) of your circle.
How do you choose the vendor and how is the pump installed?
After MSEDCL receives your payment, you pick one empanelled vendor on the portal with an OTP step. The scheme page links an empanelled vendor list. The off-grid page says that if no vendor is available for selection, the quota for your circle is exhausted and a message is shown. The installing agency does the repair, insurance and claims later.
The MSEDCL FAQ gives the installation rules. They are practical and worth reading before the team arrives on your farm.
- Panels should be in a shade-free spot, away from bird droppings, on level ground, with room for the tracking movement and easy cleaning.
- Panels should be as close as possible to the pump and the water source. The pump should sit near the panels, within the irrigated area.
- A lightning arrester is installed with the pump.
On the second point, be present at the site on installation day. If you want the panels in your own preferred place, tell the team before they start, because the pump cannot be moved later.
Can I move, sell or lend the pump after installation?
No. The MSEDCL FAQ says an installed pump cannot be moved or re-installed. It also says that, as per a clarification of the Government of Maharashtra dated 5 March 2024, selling or transferring the pump is prohibited and MSEDCL can take action against violators.
This matters if you plan to sell land or change the water source. Think first. If your borewell dries up, the pump cannot simply be moved to a new bore on another plot. Talk to the taluka MSEDCL office about what is allowed before you do anything.
What does the five-year repair and insurance cover mean?
The installing agency must repair your pump free of charge for five years and insure it for five years. The MSEDCL FAQ says that during this period the agency fixes a non-working pump free within a set repair window, and works with the insurance company on claims. You are expected to keep the panels clean.
| Item | What the MSEDCL FAQ says |
|---|---|
| Repair and maintenance | Five years, free for a pump that stops working |
| Insurance | The agency insures the pump for five years and handles the claim with the insurer |
| Your job | Clean the panels regularly |
| Theft of pump material | File an FIR at the nearest police station, then inform MSEDCL and the agency customer service centre |
| Complaints | Call MSEDCL toll-free 1800-233-3435 or 1800-212-3435. The complaint goes to the concerned agency |
The scheme page adds that you can raise and track complaints through the portal as well. Keep photos of the installed system on the day of handover. They help if you ever need to prove the condition or a loss.
How is this scheme different from PM-KUSUM Component B?
PM-KUSUM is the Central scheme of the Ministry of New and Renewable Energy. Magel Tyala is the Maharashtra scheme run by MSEDCL, where the farmer pays 10% (general) or 5% (SC/ST) and the Central and State governments pay the rest. The MSEDCL FAQ says solar pumps are also being installed in the state under PM-KUSUM Component-B, so the two run side by side.
The national rules sit on the PM-KUSUM side. The PIB backgrounder of 6 Dec 2025 says PM-KUSUM, launched in 2019, was extended until 31 March 2026, with subsidy for solar pumps up to 15 HP and central financial assistance (CFA) ranging from 30% to 50%. The PIB booklet of May 2023 explains that CFA is a share of a benchmark cost fixed by MNRE every year for a standalone pump.
On scale, PIB reported on 20 July 2023 that PM-KUSUM was launched in March 2019 and scaled up in November 2020, with a stated target of 20 lakh standalone solar pumps under Component B. The earlier PIB release of 8 Dec 2022 says that up to 31 October 2022, 21,499 standalone solar pumps had been reported installed in Maharashtra under Component B. The PIB backgrounder of 6 Dec 2025 says more than 9 lakh standalone pumps had been installed across India under Component B as of October 2025.
For all-state rules and apply links, read the live PM-KUSUM solar pump subsidy guide. The wider list of schemes sits in agriculture subsidy schemes in India. Your Maharashtra share is the MSEDCL figure of 10% (general) or 5% (SC/ST).
Is the free power scheme for farm pumps the same as a solar pump?
No. The 25 July 2024 Government Resolution is mainly about free electricity for farm pumps up to 7.5 HP, called Mukhyamantri Baliraja Mofat Vij Yojana 2024. It is a different benefit. The same GR also states the government has decided a Magel Tyala solar pump policy, which is the scheme in this post.
The GR says free power for agricultural pump consumers with a sanctioned load up to 7.5 HP runs from April 2024. The scheme period is April 2024 to March 2029, and the state will review it after three years. The GR says the government will pay MSEDCL Rs 14,760 crore a year, made up of the existing tariff concession of Rs 6,985 crore plus Rs 7,775 crore for the waived bills.
| Free power GR (25 Jul 2024) | Magel Tyala solar pump scheme | |
|---|---|---|
| What you get | Free electricity for the farm pump, up to 7.5 HP sanctioned load | A solar pump set with panels, for a 10% or 5% farmer share |
| Who | Agricultural pump consumers with a sanctioned load up to 7.5 HP | Farmers with a water source who apply and are selected, who did not take earlier solar schemes |
| Power source | Grid supply, as now | Own solar panels, daytime irrigation |
| Where it is run | MSEDCL, per the GR | MSEDCL scheme portal |
You can see the point of the solar pump if your farm has no grid connection, gets only night supply or suffers load-shedding. The MSEDCL scheme page lists "daytime power supply for irrigation" and "no electricity bill" among the benefits of the solar pump.
What are the common mistakes that delay or cancel an application?
Most delays come from papers that do not match, a water source that is not on the 7/12, a missing no-objection certificate, or a lost beneficiary number. The MSEDCL pages show how an application can fail: the form can be rejected with a reason, or rejected after the joint survey. Fix the cause before you apply again.
| Mistake | What the MSEDCL pages say or imply | What to do |
|---|---|---|
| Water source not on the 7/12 | FAQ asks for a 7/12 showing the water source | Get the entry made before applying |
| Co-owner has not agreed | Non-sole owners need a no-objection certificate from the other owners | Collect it first |
| Dark-zone water source | Needs a no-objection certificate from the Ground Water Survey Department | Get the certificate before you apply |
| SC/ST share claimed without the certificate | FAQ asks for a caste certificate for SC/ST | Upload a readable copy |
| SMS with the beneficiary number lost | Status is tracked by the beneficiary ID sent by SMS | Save the SMS and write the number in a notebook |
| Changed mobile number | Contact the SE (O&M) of your circle to change it | Contact the SE (O&M) of your circle |
| Ignoring the "Upload Documents" tab | Status A1 Form Submitted may ask for re-upload as per the SMS | Re-upload the documents named in the SMS |
Another trap is a pump that is too large for the well. The pump will lift more water than the source can give and run dry. Choose a pump you can run all day without emptying the bore.
How many Maharashtra farmers have received solar pumps?
The MSEDCL FAQ says 2,63,156 solar agricultural pumps had been installed in Maharashtra, under all solar pump schemes together, as on 6 September 2024. All India Radio News reported on 13 September 2024 that about two lakh farmers were selected under Magel Tyala in six months and about 45,000 pumps were installed.
| Date | Figure | Source |
|---|---|---|
| Up to 31 Oct 2022 | 21,499 standalone solar pumps reported installed in Maharashtra under PM-KUSUM Component B | PIB, 8 Dec 2022 |
| As on 6 Sep 2024 | 2,63,156 solar agricultural pumps installed in the state under all solar pump schemes | MSEDCL FAQ |
| 13 Sep 2024 | About 2 lakh farmers selected in the previous six months; about 45,000 pumps installed | All India Radio News |
For your own application, the circle quota note on the MSEDCL off-grid page matters: if the vendor search shows no vendor, the quota of your circle is exhausted.
What benefits does a farmer get from the Magel Tyala solar pump?
The farmer gets a complete solar pump set with panels, daytime water for irrigation, no electricity bill for the pump and no load-shedding worry. MSEDCL also gives five years of repair and insurance cover. The farmer pays only 10% (general) or 5% (SC/ST) of the pump price, and the governments pay the rest.
| Benefit | What it means on the farm |
|---|---|
| Small farmer share | 10% for general category, 5% for SC/ST, per the MSEDCL scheme page |
| No electricity bill | The pump runs on its own solar panels, so there is no power bill for it |
| Daytime irrigation | Water is available while the sun shines, so you do not wait for night supply |
| No load-shedding worry | The pump does not depend on grid supply hours |
| Five-year repair and insurance | The installing agency repairs a non-working pump free and insures it for five years |
| Online tracking | Apply, pay, pick the vendor and follow status with one beneficiary number |
Take a small example. A farmer with 3 acres falls in the 5 HP slab. A neighbour with 6 acres falls in the 7.5 HP slab. Both pay the same share of their own pump price, 10% if general category, and both get the same five-year cover. What changes is the pump size and the price it is worked out on.
Before you open the portal, keep this short list ready: the 7/12 extract with your water source entered, your Aadhaar card, the caste certificate if you are SC/ST, the no-objection certificate if the land has more than one owner, and a mobile number that stays with you. With these in hand the A-1 form takes a few minutes.
Which other farm schemes can go with the solar pump?
A solar pump solves the water and power side. Other schemes cover different costs, so you can look at them together. Each one has its own rules and its own portal, so check each scheme page for its own conditions.
- Money for seed, fertiliser and labour in the season: see the Kisan Credit Card guide for the limit and how to apply.
- Income support and instalment problems: the PM-Kisan instalment status guide explains eKYC and payment checks.
- Crop loss protection: the PM Fasal Bima Yojana guide covers premium and claims.
- Spraying and machinery: the agri drone subsidy and tractor subsidy guides cover those schemes.
- Digital records: a farmer ID is explained in the AgriStack Farmer ID guide.
- Dates: the agri schemes calendar collects deadlines in one place.
Plan the cash side early. Your share is only 10% or 5%, but you pay it after the firm quotation is issued. If the money is a problem, ask your bank about a loan before you reach that step, so the status does not sit at the quotation stage.
Which phone numbers and offices can help with the solar pump application?
MSEDCL gives toll-free numbers 1800-212-3435 and 1800-233-3435. The national toll-free numbers 1912 and 19120 are also listed. For the scheme, the e-mail is agsolar@mahadiscom.in. If you cannot apply online, the MSEDCL FAQ says to contact the taluka sub-divisional office.
| Contact | Detail | Source |
|---|---|---|
| MSEDCL toll-free | 1800-212-3435 and 1800-233-3435 | MSEDCL scheme page, FAQ, off-grid page |
| National toll-free | 1912 / 19120 | MSEDCL scheme page |
| Scheme e-mail | agsolar@mahadiscom.in | MSEDCL off-grid page |
| Taluka sub-divisional MSEDCL office | For help if you cannot apply online | MSEDCL FAQ |
| Head office | Hongkong Bank Building, M.G. Road, Fort, Mumbai 400001 | MSEDCL scheme page |
Use these numbers rather than a number from a social media post. If a caller says he is from the scheme and asks for money outside the portal, stop and call the toll-free number yourself.
Conclusion
The Maharashtra solar pump subsidy is run by MSEDCL as the Magel Tyala Saur Krushi Pump Yojana. A general category farmer pays 10% of the pump price and an SC/ST farmer pays 5%. Pump size follows land: 3 HP up to 2.5 acres, 5 HP for 2.51 to 5 acres and 7.5 HP above that. You apply online with the A-1 form, a 7/12 extract showing the water source and Aadhaar, pay the firm quotation, choose an empanelled vendor and get five years of repair and insurance. The pump cannot be moved or sold. Your firm quotation shows the amount to pay; use the MSEDCL portal and helplines for every step.




Leave a Comment